CASES

Slurry Separation System

China Railway 16th Bureau Group slurry separation system

The main project of the project is to pass through the South Main Line of the South-to-North Water Diversion Project and the Zhengzhou South Railway Station Intercity Airport, using shield construction, single-layer segment lining, circular structure, shield machine diameter of 12.81 meters, is the largest diameter shield tunnel. Winner group provide the shield sludge treatment system for the project, the system handling capacity of 3000 cubic meters / hour, 24 hours non-stop operation, efficient, energy saving, environmental protection.

Slurry Separation System

 

Slurry Separation System

 

Slurry Separation System

 

Slurry Separation System

 

Slurry Separation System

Inquiry

Please Feel free to give your inquiry in the form below. We will reply you in 24 hours.

      
       Name:       Tel:
   *E-Mail:   *Products:
       Country:       Company:
*Message:
wmvibratingscreen +86 13373745380